New Batch Annealing line with 20 thousand tons/year capacity, one furnacee and one cooling hood is put into function with a ceremony where our Board President Mr Ali PANDIR , and Board members Mr Bulent BEYDUZ and Mr Ahmet ANAYURT have attended.
The production and assembly of the line which is produced by Tenova- LOI , is completed within the proposed time and budget. High permeable electrical steel will be produced in the line which has an ability to be loaded 3 coils per base at once.